Revised CAP POC.07456 - Control Range Establishment or Verification

7 followers
0 Likes

"An acceptable control range is established or verified for each lot of control material."
Note: For assayed control materials, control ranges supplied by the manufacturer must be verified.

How are you guys verifying the assayed manufacturer's control ranges for non-waived testing on instruments such as ACT Plus, HMS Plus and TEG 5000? 

2 Replies

We run the QC when we receive it to verify the ranges match the manufacturer printed ranges.

We do the same as Adonica.  From my POC Quality Control Policy:
New QC lot control range is verified by lot-to-lot comparison with the in-use QC lot.  This lot-to-lot comparison is performed by the same operator, on the same device, using the same cartridge lot number.  Both new and in-use QC lots must fall within the range supplied by manufacturer to verify.

Reply
Subgroup Membership is required to post Replies
Join POCT Listserv now
Breana Birmingham
over 4 years ago
2
Replies
0
Likes
7
Followers
92
Views
Liked By:
Suggested Posts
TopicRepliesLikesViewsParticipantsLast Reply
Piccolo express
Deborah Martuch, MT(ASCP), CPP
over 2 years ago
30262
Deborah Martuch, MT(ASCP), CPP
over 2 years ago
Quantra
Ashlee Byquist
over 2 years ago
50339
Ashlee Byquist
over 2 years ago
PPM Procedures/Resources
Jennifer Toncray
over 2 years ago
50256
Jennifer Toncray
over 2 years ago